Acquisition Talk

A daily blog on weapon systems acquisition

  • Home
  • Blog Posts
  • Podcast
  • PPBE Reform
  • About
  • Resources
    • Reading List
    • Links
    • Papers
    • Top Posts
    • AFWERX data
  • Contact

mean time between failure

The problem of metric selection for operational testing

January 31, 2020 Eric Lofgren 0

I would be perfectly willing operationally to test anything anybody can name without having measures of effectiveness or criteria for the test. I am also […]

Share this:

  • Print
  • Facebook
  • LinkedIn
  • Reddit
  • Twitter

Get posts by email

Search

Featured

  • Acquisition headlines (5/3/2020)
  • China focuses on applied tech much more than the US
  • Modular design requires rethinking the program concept
  • Palmer Luckey on rapidly fielding counter-UAS
  • Lessons in mobilization: The industrial base is too small and too slow
  • DoD can’t do rapid prototyping like it used to
  • Government pays for inactive contractor labor during Covid-19

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

RSS Error: WP HTTP Error: A valid URL was not provided.

Copyright © 2025 | WordPress Theme by MH Themes