Acquisition Talk

A daily blog on weapon systems acquisition

  • Home
  • Blog Posts
  • Podcast
  • PPBE Reform
  • About
  • Resources
    • Reading List
    • Links
    • Papers
    • Top Posts
    • AFWERX data
  • Contact

CBO

The need to rebalance DoD spending toward Procurement to deter China

January 24, 2023 Eric Lofgren 0

The excellent Pete Modigliani had an interesting post recently on the proportion of RDT&E and Procurement in defense budgets. In the 1980s, Procurement was nearly […]

Share this:

  • Print
  • Facebook
  • LinkedIn
  • Reddit
  • Twitter

Aircraft availability and flying hours have been plummeting since 2000

January 11, 2022 Eric Lofgren 0

The CBO has a nice, short paper on aircraft availability rates in the Air Force and Navy. Check out the charts. There’s been a general […]

Share this:

  • Print
  • Facebook
  • LinkedIn
  • Reddit
  • Twitter

CBO analysis of FY22 shipbuilding plan — fewer VLS cells distributed across more ships

September 22, 2021 Eric Lofgren 0

Most cruisers and destroyers in today’s fleet carry between 90 and 122 VLS [vertical launch system] cells. Although the LCS does not carry the VLS, […]

Share this:

  • Print
  • Facebook
  • LinkedIn
  • Reddit
  • Twitter

CBO compares cost of UAS and manned ISR aircraft

June 8, 2021 Eric Lofgren 0

Conventional wisdom holds that UASs cost less than manned aircraft because they do not need life support equipment such as oxygen systems, cabin pressurization, and […]

Share this:

  • Print
  • Facebook
  • LinkedIn
  • Reddit
  • Twitter

What will military aviation look like in 2050? A lot like 2020?

January 17, 2020 Eric Lofgren 2

On average, the Army’s aircraft are 14 years old, and the Department of the Navy’s are 16 years old; the Air Force’s aircraft, on average, […]

Share this:

  • Print
  • Facebook
  • LinkedIn
  • Reddit
  • Twitter

Get posts by email

Search

Featured

  • Are Appropriators blocking defense transformation?
  • Does DoD need a public relations campaign for mobilizing industry?
  • Are certified managers associated with worse project outcomes?
  • An auction trilemma?
  • Air Force struggles to develop a fighter for over a dozen years, circa 1971
  • Air Force’s NGAD needs to be a “team of systems,” not a “family of systems”
  • Providing two or more sources of production doesn’t always lead to higher costs

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

RSS Error: WP HTTP Error: A valid URL was not provided.

Copyright © 2025 | WordPress Theme by MH Themes