Acquisition Talk

A daily blog on weapon systems acquisition

  • Home
  • Blog Posts
  • Podcast
  • PPBE Reform
  • About
  • Resources
    • Reading List
    • Links
    • Papers
    • Top Posts
    • AFWERX data
  • Contact

AMARC

PMs spend too much time at briefings where no decisions are made

December 31, 2021 Eric Lofgren 0

In the early 1970s, the Army took it upon itself to review its acquisition system. The AMARC report found that the Army was “profoundly affected” […]

Share this:

  • Print
  • Facebook
  • LinkedIn
  • Reddit
  • Twitter

Differing opinions of requirements: how fixed should they be ahead of prototyping?

November 20, 2019 Eric Lofgren 2

Here is the opinion of the Requirements & Concepts Panel for the Army Materiel Acquisition Review Committee (AMARC) of 1974: In the opinion of our […]

Share this:

  • Print
  • Facebook
  • LinkedIn
  • Reddit
  • Twitter

Are better requirements the answer to acquisition?

June 11, 2019 Eric Lofgren 0

Here are some excellent insights from the Army Materiel Acquisition Review Committee’s 1974 report. Might sound like a lot of the arguments going on today […]

Share this:

  • Print
  • Facebook
  • LinkedIn
  • Reddit
  • Twitter

Single- vs. Multi-Function Systems

December 21, 2018 Eric Lofgren 0

Here is Navy Matters on single vs. multi function system design: So many people want to cram every capability they can think of onto every […]

Share this:

  • Print
  • Facebook
  • LinkedIn
  • Reddit
  • Twitter

The ineffectiveness of cost-effectiveness analyses

December 14, 2018 Eric Lofgren 0

Cost Operational Effectiveness Analyses (COEA). The COEA done for the major Army projects are of spotty quality and in some cases non-existent. What should be […]

Share this:

  • Print
  • Facebook
  • LinkedIn
  • Reddit
  • Twitter

Get posts by email

Search

Featured

  • Acquisition headlines (7/12 – 7/18/2021)
  • Acquisition headlines
  • Applying Boyd’s OODA loop to shipbuilding
  • Why is construction so costly in the US?
  • Are SBIR funds just too difficult to win for their worth?
  • Acquisition headlines
  • The subjectivity of project planning

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email.

RSS Error: WP HTTP Error: A valid URL was not provided.

Copyright © 2025 | WordPress Theme by MH Themes